Documents
You can view the draft planning application below:
Ely Valley Solar Farm – Draft Planning Application and Consultation Documents
Application Form
Planning Statement
Design and Access Statement
Environmental Statement (Vol 1)
Non Technical Summary (Vol 3)
Environmental Statement – Technical Appendix (Vol 2)
A) Scoping Opinion
B) Pre-Application Response
C) Transport Statement
D) Agricultural Land Quality Report
E) Coal Mining Risk Assessment
F) Flood Consequences Assessment
G1) LVIA Methodology and Assessment Tables
G2) LVIA Figures
Drawing Titles
Landscape Planning Constraints – 2.5km Study Area – Part 1
Site Boundary & Aerial Context – 500m Study Area – Part 1
Landscape Character – LANDMAP – Visual Sensory – Part 2
Landscape Character – LANDMAP – Geological – Part 2
Landscape Character – LANDMAP – Landscape Habitats – Part 2
Landscape Character – LANDMAP – Historic – Part 3
Landscape Character – LANDMAP – Cultural – Part 3
Visual Receptors – Part 3
Site Masterplan – Landscape and Ecological Mitigation and Zone of Theoretical Visibility Part 4 and Part 5
G3) Photomontages – Part 1 – Part 2 – Part 3
Photomontages Methodology – Part 1 – Part 2
H) Ecology
I) Heritage Desk Based Assessment
J) Noise
K) Green Infrastructure Strategy
Drawing Title
Site Location Plan
Planning Application Boundary
Site Layout
PV Panel Details
DNO Substation Detail
Transformer and Control Equipment Details
Customer Cabin Details
Spares Cabin Details
Fencing and Security Details
Deer Mesh Fencing Details
Palisade Fencing Details
Temporary Site Set Down Area Details
Proposed Cable Route
Internal Access Track Construction Detail
Consultation Documents
Community Newsletter (Bilingual)
Schedule 1B (Bilingual)
Schedule 1C (Bilingual)